SPACE ressie admits terrace WILL NOT be finished for opening

McRackin

Super Moderator
this is what oscar colorado said 15 minutes ago on the radio :!:

colorado.jpg


the first party to start is la comunidad on june 17th so i wouldnt be surprised if the club is not completly finished till that weekend..........
 
Hopefully they'll get the essentials done by then: floor, DJ booth, sound. That is all you need...oh, and people. :)

~Jason
 
Agree totally McRackin, not a sceptical person at all, but will they cordon off the building site from the rest of the venue? Anyway I'm still keeping a very open mind...by the way whats on at El Divino on Sat 5th?
 
If the worst come to the worst, I'm sure they can just set up two extra arenas in the car park instead of just the normal one.

And they must have known it wasn't going to be finished for a while, as they haven't bothered to announce any headline DJs for the terrace.

They normally have Erick Morillo and another guest.
 
Reckon they should just concentrate on the inside/decor/sound/light/bars etc and forget about that silly roof ;)
 
Stephen C said:
If the worst come to the worst, I'm sure they can just set up two extra arenas in the car park instead of just the normal one.

And they must have known it wasn't going to be finished for a while, as they haven't bothered to announce any headline DJs for the terrace.

They normally have Erick Morillo and another guest.

yep, this is the main giveaway.
I'd heard a few weeks ago that it was very doubtful but didn't want to say.

I just wonder how the club is going to work, logistically, for the opening. Plus reduced capacity etc.
 
I guess this is no big surprise to anyone.. I wonder if they will actually have it running by WLS opening.. I mean this is only six weeks away and going but the latest photos it looks unlikely it will be ready for then...

I guess only time will tell
 
lynch said:
I guess this is no big surprise to anyone.. I wonder if they will actually have it running by WLS opening.. I mean this is only six weeks away and going but the latest photos it looks unlikely it will be ready for then...

I guess only time will tell

I'm guessing finished but no time to but the roof on.....
 
Buckley said:
I'm guessing finished but no time to but the roof on.....

I predicted that months ago! My mystic ball told me there was going to be one more summer with no terraza roof! :lol:
 
The Space people must be livid at whoever they contracted out to do the job. How much money will they be losing out on the Space Opening alone?
I'm guessing the capacity will be reduced by at least 400 people.. come to think of it when have Space ever paid attention to capacity numbers?
:D
 
lynch said:
I guess this is no big surprise to anyone.. I wonder if they will actually have it running by WLS opening.. I mean this is only six weeks away and going but the latest photos it looks unlikely it will be ready for then...

I guess only time will tell

Well if its not ready for WLS opening then I probably won't bother going for the day sesh :? Just go in the evening then perhaps onto DC10 :roll:
 
Back
Top